← Back to Tools

NRE Quote Simulator

Estimate your one-time development cost — engineering, tooling, prototyping, and certification. No surprises.

🎨 Industrial Design

Product appearance, ergonomics, CMF (color, material, finish).

📐 Mechanical Engineering

3D CAD, tolerance analysis, mold design, FEA simulation.

Electronics Engineering

Schematic, PCB layout, power design, signal integrity.

💻 Firmware & Software

BSP, drivers, application logic, OTA, cloud integration.

🔩 Tooling & Molds

Injection mold fabrication, jigs, fixtures, test equipment.

🧪 Prototyping(select all that apply)

Functional prototypes for testing and investor demos.

📜 Certification & Testing(select all that apply)

Regulatory testing and compliance for target markets.

NRE Quote Estimate

One-time development investment

Select services to build your quote

Estimates based on Shenzhen engineering service rates. Actual costs depend on complexity, timeline, and specific requirements. 50% NRE typically due at project kick-off.